Note 06: RECEIVING INSP INSTR Note 06: Inspect per QII (Gen) Rec 003. Note 06: If this is receipt is after 05/28/97 generate an IR Note 06: identifying the requirement to test one piece per eng std Note 06: A165001. Note 06: Hold PO for performance of the following tests: Note 06: (1) Hi-Pot in receiving inspection per eng std A165001. Note 06: (2) Temperature rise test in product safety & liability Note 06: per eng std A165001. Note 06: Perform the hi-pot test and document results on the ir. Note 06: Send ir and one transformer to Product Safety & Liability Note 06: 2R8 for temperature rise test. Note 06: Product Safety & Liability perform temperature rise test, Note 06: document results on the ir and provide disposition of lot Note 06: on ir. Note 06: If acceptable: Area QE update above date by one year. Note 06: If unacceptable: Handle per normal MRC procedure. Note 06: WLH 03/15/93 Note 14: COMP DATA APPL NOTES Note 14: ********************************************************* Note 14: *** Revision Freeze: Do Not Revise Without PS&L Review*** Note 14: *** Per EB Instruction 0455-50-06 *** Note 14: *********************************************************